The latest news
Gaislachkogel, Skiresort Soelden, Austria
(December 2010)
It was ready when skiing season started. ICS Vertical was 3 months on the site with up to 30 workers at the same time. Working on all 3 stations at the same time and alltitude up to 3000m: exiting logistics in alpin terrain.
Several kilometer static rope, hundrets of biners and slings marked the path over the roofs. Burning sunshine and heavy snowfalls with temperatures down below -15°C.
07.04.2011
Yeti exists!
Presentation by SKODA of the new YETI in the Austrian alps.
16 days event with effects for up to 300 international car dealers.
For the event agency VOK DAMS we had to let Yeti Footsteps apear out of nothing. Step by step 20 sqm tracks got visible at one blow. In adition each step was seperatly illuminated at night.
30.07.2009
5 tons of steel into a production hall
To stabilize the roof of a production hall our workers had to mount steel bars and tubes while belowe the process of botteling milk was continued.
To keep production running we had to use rope access and technical climbing .
For an efficiant mounting our engineers where involved into planning already.
18.12.2008
EVONIK-Unveiling wins Gold
On this years Event Award of the German forum for marketing+eventagencies our client Evonik Industries AG won gold with its start of the brand EVONIK. Kreativ Agency was the Vok Dams Group.
ICS Vertical produced a custom-made wrapping.
Planing, technical production, mounting an event unveiling one single source.
Here a small film about the making off:
15.11.2008
Maya on a hook
A banner with 42m x 12m had to be installed infront of a new facade with fragile stones; drilling was not allowed at all.
ICS callculated quickly and constructed with aluminiumstructures, ropes and climbing technics a frame in front of the building. Safe during storms and without the slightest damage after dismounting.
13.11.2008
K+S in the German Share Index (DAX)
K+S from Kassel, Germany, went public with their rise in the German Share Index. world leader in trading salt and fertiliser covered the head office next to the large train station.
For the mounting of the 42m x 13m banner we where not allowed to drill holes for ankers. We only used ropes, pipe constructions and water ballast. During nights 16 spotlights illuminated the scene.
16.09.2008
Working in the Bavarian Alps
Our Team of certified workers prepared several areas neer the Tegernsee for geological research. Trees, rocks and earth had to be removed.
07.07.2008
Radar in the Caribbean
Workers from ICS Vertical mount radar domes in Trinidad and Barbados. The 20m high antennas are installed to support the metereological institutes and are financed with the suppport of the European Community.
The glass fibre reinforced dome was constructed to protect the antenna from the influence of weather. After putting together the puzzle of Panels we had to seal the parts to keep water out during hurricane season.
09.04.2008
AGFA - Tower Munich
At february 17th the AGFA Tower in munich was blown up.
Before this we had to remove the complete exterior covers. Several tons of stainless steal and insulation had to be taken down.
Instead of expensive and partly impossible scaffoding a team of up to 10 climbers finished within time.
30.01.2008
